INVESTIGATION LOGELAPSEDT+00:00OF T+02:31
WOCUL · AI-NATIVE WORK MANAGEMENT

How does Wocul AI earn the answer?

Wocul is work management where Wocul AI investigates your tasks against your documents and live systems. Everything it does, it shows — and what it finds becomes work on your board. That's the product.

CASE FILE 01 · COMPLIANCE

Does Tower B's submitted egress design comply with the code?

T+02:31 · AUDIT MODE · KB + DRAWINGS — NO CONNECTORS GRANTED

01 / 8

ONE INVESTIGATION · START TO FINISH — DRAG FOR A DIFFERENT CASE · 8 ON FILE

SCROLL = TIME — THE TRACE BEGINS BELOW

00:00STEP 0 · THE ASK

A question becomes a task.

TASK CREATED FS-214 · P1

Does Tower B's submitted egress design comply with the code?

board Compliance Review · tags **egress · rev-C** · attachments 2
nothing runs without a record

You ask in plain English. Wocul AI shapes it into a task you can edit before anything starts — so the answer lands as work, not as chat history.

ON THE DESK
Tower B's submission thread — 12 events · approvals 2 of 2 signed
egress-plan-revC.pdf — 14 sheets · opened
design-basis-report.pdf — opened
knowledge base index · 1,513 sections standing by
00:04STEP 1 · GATHER

It reads the record first.

Task history, approvals, comments — and the attachments are opened before planning begins, so the material under review is on the desk from the first move.

KNOWLEDGE BASE · FIRE CODEFETCHED VIA CROSS-REFERENCE · p. 312
TABLE 3.14 — OCCUPANT LOADMIN. EXITS
501 – 1,0003
1,001 – 1,250 ← occupant load 1,0224
GF EGRESS PLAN · SHEET 6/14EXIT AEXIT BREGION RE-RENDER
ZOOM ×4
Exits provided: 2
EXIT A · EXIT B — no others marked, sheets 6–14
00:31STEP 2 · READ

The code answers with page numbers.

"As per Table 3.14" isn't a dead reference — the cross-reference resolves and Table 3.14 itself comes back. On the drawing, a region too small to read with certainty is re-rendered at higher resolution: read, not guessed.

tables stay tables · figures are seen · every retrieval carries its page

01:12STEP 3 · REACH

It can only touch what you granted.

Toolsets are assembled per investigation from the project's linked connectors. Nothing is linked here — so the database and repo tools don't exist — there's nothing to decline.

when linked: MySQL · MongoDB read-only by construction — verified daily · GitHub down to the branch the task means · every call audited

CONNECTOR TOOLSET — ASSEMBLED PER INVESTIGATION
KB · ATTACHMENTS · RECORDactive
BIM MODELnot linked · tools not loaded
DOCUMENT CONTROLnot linked · tools not loaded
CANNOT REACH WHAT YOU HAVEN'T GRANTED
01:58STEP 4 · VERIFY

The report is attacked before you see it.

Deterministic checks re-run the math and the claims; then an independent adversarial pass tries to refute the findings. What survives, ships. What can't be verified is said plainly.

DRAFT REPORT
FLOORS · SAME RULES, EVERY REPORT
arithmetic re-checked digit for digit
"highest / lowest" recomputed from the table
counts reconciled across blocks — 25 + 10 + 2 = 37
contradiction scan — no P and not-P on one clause
decided verdicts on hedged evidence — none
adversarial pass — no refutation stood
SHIPS
02:14STEP 5 · NEEDS YOU

Where the record ends, it asks.

Wocul AI askedBLOCKING

Which revision governs the occupancy schedule — Rev B or the Rev C addendum?

One fact exists in no readable source. Wocul AI doesn't pick the convenient reading — it asks, showing what it already tried. Your answer resumes the investigation.

YOUR ANSWER — A FORM, MID-INVESTIGATION
Rev B governs
The Rev C addendum governs
Submit answer — resume the investigation
TRIED — PROOF OF WORK
title blocks, both revisions — dates conflict
transmittal log — no supersession note
no governing document on record
02:31STEP 6 · REPORT

Cited, decided, exportable.

An audit-mode report: one verdict per item, each citing its clause and page. The items the record couldn't settle say so — honest over confident.

WOCUL AI REPORT · WR-2026-0184AUDIT MODE

Egress compliance — Tower B, Rev C

CONFIDENCEHigh
EFFORTContained
RISKCritical
DEVIATESExits provided: 2 — occupant load 1,022 requires ≥ 4T 3.14 · p. 312
COMPLIESTravel distance, all storeys within limit§3.9 · p. 288
UNVERIFIEDOccupancy schedule — awaiting your answer aboveasked · blocking

37 ITEMS · 25 COMPLY · 10 DEVIATE · 2 UNVERIFIED — FULL MATRIX IN THE REPORT

↓ PRINT-READY PDF↓ REPORT + DATA TABLES · ZIPEN · AR
02:31STEP 7 · THE LOOP

Findings become work.

The report's next steps arrive as a plan — accept to create. Ten deviations become ten tasks with owners and checklists, on the record, back where this started.

PLAN · ACCEPT TO CREATE
10 remediation tasks — one per deviation, clause attached
board Compliance Review · owners suggested · checklists drafted
nothing is applied until you accept — and it's reversible
10 TASKS · CHECKLISTS · CLAUSES ATTACHED
FS-215Add 2 exits — ground floor eastCLAUSE T 3.14 ATTACHED
FS-216Re-issue occupancy scheduleCLAUSE §1.4 ATTACHED
+8
BACK ON THE BOARDWhere this started — the record holds the answer and the work it created.FS-214 · P1
YOUR TURN · T+00:00

Now run yours.

Everything above ran on someone else's documents and systems. Start a project, add one document or answer a few questions, and ask — your first cited report costs nothing.

Start free

READ-ONLY BY CONSTRUCTION·NO WEB ACCESS BY DESIGN·NEVER TRAINS MODELS FOR OTHERS

TRACE NOTES — SOME CASES REPLAY RECORDED INVESTIGATIONS ON A PUBLIC FIRE CODE, A DEMO DOCUMENT SET, AND A SEEDED RETAIL DATASET; THEIR NUMBERS ARE MEASURED, NOT INVENTED. OTHERS ARE ILLUSTRATIVE SCENARIOS ASSEMBLED FROM SHIPPED CAPABILITIES. TIMINGS COMPRESSED FOR READING. AI USAGE IS INCLUDED IN EVERY PLAN; EVERY CORE FEATURE WORKS WITH AI OFF. REPORTS IN ENGLISH AND ARABIC.